The same inquiries and debates regarding contracting new progressive cavity pumps as they tend to surface time and again when discussing projects with engineers at fairs and exhibits. PC pumps are frequently designed with features that make maintenance and installation easier. When commissioning a new pump, users may ask what to expect the first time they use a PC pump. Remember the ten items in this article before using the pump for the first time to prevent making many rookie blunders.
Adjust the
belts and sheaves- Belt-driven systems can be versatile and
dependable, but incorrect installation and maintenance can result in premature
belt failure. Incorrect or careless configuration can also have a significant
impact on the working life of motors and driven components. Confirm the belt
drive arrangement before starting up, as these components may change during
shipping or installation. Check that the sheaves are aligned within the pump's
tolerance when verifying setup.
Check the
wiring and the belt drive tension- Confirm that the
electric power leads are wired in accordance with the wiring diagram. This
should be confirmed by either the plant's or the contractor's electrician.
Finally, validate the pump's rotation with a brief "bump test." Check
the belt tension and ensure it is as specified in the owner's manual. Adjust
the belt tension as needed.
To avoid short
circuit problems-For proper commissioning, general electrical
checks should be confirmed. If the fusers or trip points are set too low, it
might pose operational risks and problems, while setting them too high can harm
electrical system components.
Ascertain that
the needed voltage is present- Consult with the plant or a
contract electrician to ensure that the necessary voltage is available. At the
motor conduit box, verify the motor leads for operational amp and line voltage.
Additionally, ensure that electric circuits are properly safeguarded with
adequate fuses, breakers, and time delay settings. When compared to other types
of pumps, the starting torque of a PC pump is considerable, but it becomes
linear with speed after the initial startup phase. Variable frequency drives
(VFDs) are commonly used to power PC pumps.
Examine the
lubricating fluid- Check that the pump is lubricated
properly, whether with water or another suitable fluid. PC pumps and components
may or may not be packaged and supplied with first-fill lubricants, depending
on the manufacturer and design. Grease-lubricated components must be filled,
and if water testing is being performed, the suction housing must be filled
with process fluid or water.
Monitor startup- It is recommended that on the first day of a startup, you refer to and apply the provided manufacturer's startup method and checklist to document the pump's performance.
Correctly commissioning a PC pump is essential to many
projects since PC pumps are vital to many operations. Following these 7 steps,
from opening valves to verifying electrical checkpoints, will help ensure
necessary measures are not missed and the process runs smoothly from the start.
If you are looking for a highly efficient and effective
progressive cavity pump for various applications in different verticals,
contact Risansi Industries Ltd. It is the leading pump manufacturers in
India with over four decades of experience. Contact the team to select the best
pump for your industries.
Comments
Post a Comment